UNSW HTH F22 Bank Building

UNSW HTH F22 Bank Building

Formula Interiors dramatically transformed the old F22 Building, formerly known as The Bank (an on-campus branch of the Commonwealth Bank), into a light-filled, stimulating, purpose-built facility. This project is the first stage of realising the new Health...
UNSW F23 & E6 Power Supply

UNSW F23 & E6 Power Supply

Formula Interiors successfully fulfilled UNSW’s objectives by upgrading existing rooms in two buildings to meet exam requirements as needed. F23 Mathews Building The scope of work included the installation of 31 retractable General Power Outlets (GPOs) in the...
Griffith University Nathan Campus N55

Griffith University Nathan Campus N55

This project involved simultaneous refurbishment and new construction in two separate buildings, N34 and N55, each managed by its own project team. Both buildings are home to Griffith University’s specialised laboratories. The scope of work included...
Griffith University Nathan Campus N34

Griffith University Nathan Campus N34

This project involved simultaneous refurbishment and new construction in two separate buildings, N34 and N55, each managed by its own project team. N34 features three levels plus rooftop works, totalling 3,450m², while N55 consists of four levels plus rooftop works,...
UNSW H6 Invigilated Power Supply

UNSW H6 Invigilated Power Supply

The clients’ goal was to create a temporary exam set up, with individual power supply to each table, enabling students to complete their exams using their computers. This project was completed in 2 stages, the ‘Installation Phase’ and the ‘Pack Down’ phase. Stage 1:...