Formula was engaged to refurbish and upgrade two conventional operating theatres and their accompanying service areas plus fit out a pioneering, hybrid operating theatre that incorporates state-of-the-art audio visual, lighting and full-body diagnostic imaging equipment.
Working in a functional Operating Theatre (OT) environment whilst maintaining particulate control is always a major challenge. By using elevating air filtering and monitoring protocols above accepted industry practice, the adjoining OTs were kept free of contamination and a new standard was achieved in risk mitigation on an OT construction project.
ADDRESS: 457 Wickham Terrace, Brisbane
DURATION: Three stages over 16 weeks