SCOPE: Following a reduction in staff, RMB sought to achieve a ‘high end’ fitout that maximised the functional space within their new downsized tenancy.

PROJECT: Formula completed the design and construct project with outstanding results. Works included plasterboard and glazed partitions, doors and hardware, vinyl and timber floors, services (electrical, data, AV, mechanical, fire, security, hydraulic), signage and corporate branding, detailed joinery, operable wall, metal feature wall panelling, workstations and loose furniture.
The fitout works were completed concurrently with the base building fire services upgrade on the floor.

ADDRESS: Part Level 15, 60 Castlereagh Street, Sydney NSW 2000

SIZE: 250m2

DURATION: Four Weeks

DESIGN: AriiSmits