PROJECT: Approximately 250 sqm of Steel Cementitious access floor panel was installed on Level 2, to provide underfloor cable access to the data room.
Formula performed subcontractor services to supply and install access floor via JLL, and worked closely with their project team to ensure delivery and installation was scheduled to suit programming and staging requirements.
Rise access flooring offered the client competitive costing, local product stocking and Melbourne based installation teams to best suit tight project timeframes. Rise also delivered to all specification requirements for data room flooring and suitable product strength.
ADDRESS: Level 2, 181 William Street, Melbourne
SIZE: Approximately 250m2
DURATION: Two Weeks
DESIGN: Hassell